MHSMOBILE HABITAT STANDARD
CAMPERSTECHNICALTRAVELNEWS
MHS · REMOVABLE MOBILE HABITATS

The global knowledge portal for removable mobile habitats.

Compare campers, understand their systems, solve technical questions, discover real journeys and follow the industry in one independent platform.

100-point ratingEvidence-based recordsTechnical knowledgeTravel & field reportsVerified incident evidence

Top rated modules

The twenty highest ranked assessed configurations currently published by MHS.

RankManufacturer / ModelCountryEvidenceRatingClass
Loading current MHS rating…

MHS classes

The full MHS scale runs from 0 to 100 points.

How MHS works
A+90–100
A75–89.9
B60–74.9
C45–59.9
D30–44.9
E20–29.9
F0–19.9

MHS NEWS

Independent coverage of products, manufacturers, technology, market developments, events and regulation.

All news

Loading MHS News…

MHS CAMPER DATABASE

Explore removable campers.

Browse the MHS market catalog, filter by vehicle fitment and technical specifications, compare assessed products and open a structured profile for every published model.

–Catalog records
–Assessed
–Manufacturers
–Countries
⌕
Loading database…Structured MHS market records
Open ranking →
Loading MHS Camper Database…
MHS TECHNICAL KNOWLEDGE

The engineering encyclopedia behind mobile habitats.

Understand the components inside a camper, how complete systems are built and how the engineering works in practice. MHS Technical connects equipment, system architecture, guides and confirmed camper installations.

Explore by system

Start with the subsystem you are trying to understand. Each system connects architecture, components, guides and camper installations.

Loading knowledge records…

Technical records

Foundation records for the MHS Technical Knowledge Base.

One engineering layer across MHS

A camper profile tells you what product exists. Technical explains what is inside it, how the system works and which exact components are confirmed in real camper records.

COMPONENTA specific piece of equipment and its verified manufacturer data.
SYSTEMThe architecture that connects multiple components into one working subsystem.
GUIDEA practical explanation of an engineering question or design decision.
CAMPER LINKConfirmed installations connect technical records back to real products.
MHS TECHNICAL / SYSTEM 01

Power & Electrical

The electrical system is the energy backbone of a mobile habitat. This page shows the architecture from charging sources to storage, distribution, conversion, protection and monitoring, then links each layer to the MHS component and guide records that explain it.

System architecture

This is a conceptual architecture, not an installation wiring diagram. Exact cable sizes, protection devices, charging limits and grounding depend on the selected equipment and vehicle.

Vehicle alternator
→
DC/DC charger
→
House battery
Solar array
→
MPPT controller
→
House battery
Shore power
→
Inverter / charger
↔
House battery
House battery
→
DC distribution + protection
→
12 V loads
House battery
→
Inverter
→
AC loads
Monitoring sits across the architecture rather than in the power path: shunts, chargers, inverter/chargers and gateways report energy flow and device state without replacing hardwired protection.

What the system has to do

  • Accept energy from the vehicle, solar and shore-power sources that are actually installed.
  • Store energy in the house battery within the battery and BMS operating limits.
  • Distribute DC power with branch protection and service isolation.
  • Convert DC to AC when an inverter is part of the camper architecture.
  • Expose enough monitoring to understand battery state and charging behaviour.

MHS records in this system

← Back to Technical
MHS / Technical

Four Wheel Campers Système d’alimentation 12V

Architecture électrique d’usine utilisée sur les cellules amovibles pour pick-up FWC actuelles à montage sur plateau/sur benne/CampOut : batterie auxiliaire au lithium, recharge par le camion, alimentation de quai 120 V via un convertisseur 30 A, prises 12 V/USB et précâblage solaire.

Overview

Ce que signifie « Système d’alimentation 12V moderne »

Four Wheel Campers utilise l’expression Système d’alimentation 12V moderne avec recharge par le camion sur les fiches de modèles et configurateurs actuels.

Il ne s’agit pas d’un boîtier unique avec un seul SKU. Il s’agit d’une architecture électrique d’usine reliant la batterie auxiliaire, le circuit de recharge par le camion, la distribution 12 V, le convertisseur d’alimentation de quai, les prises et la préparation solaire.

MHS l’enregistre donc comme un Système.

La batterie auxiliaire standard

Les spécifications actuelles des versions complètes et Base/CampOut identifient une batterie auxiliaire au lithium comme élément du système électrique standard.

La capacité exacte de la batterie peut varier selon le modèle, la révision de production ou le pack sélectionné.

Un lien de Système confirme donc l’architecture avec batterie auxiliaire au lithium, mais n’attribue pas une marque/capacité de batterie particulière sauf si une source distincte concernant le composant l’identifie.

Recharge par le camion

Les documents actuels de FWC incluent explicitement la recharge par le camion.

Les manuels du propriétaire décrivent la recharge du camion vers la cellule amovible pour pick-up au moyen d’une architecture DC/DC/BCDC, le type exact de chargeur variant selon les systèmes standard et avancés.

Explication de MHS. La « recharge par le camion » est pertinente même avant de connaître le modèle exact du chargeur DC/DC : la cellule amovible pour pick-up peut recharger sa batterie auxiliaire depuis le système électrique du camion par l’intermédiaire d’un circuit de recharge contrôlé.

Pourquoi un chargeur contrôlé est important

Les véhicules modernes ne maintiennent pas nécessairement la tension de l’alternateur à un niveau fixe.

Un chargeur DC/DC peut gérer l’alimentation côté camion et appliquer un profil de charge approprié à la batterie de la cellule amovible pour pick-up.

Il contribue également à séparer le système de démarrage du camion du système auxiliaire de la cellule amovible pour pick-up.

Alimentation de quai

Les spécifications actuelles de FWC identifient un système électrique d’alimentation de quai 120 V avec un convertisseur de 30 ampères.

Lorsqu’il est branché à une alimentation AC externe, le convertisseur alimente le système 12 V et recharge la batterie auxiliaire lorsque le système est activé/configuré de manière appropriée.

Ce n’est pas la même chose qu’un onduleur. Le convertisseur standard convertit AC en DC.

Tableau de disjoncteurs 120 V

La documentation du propriétaire de FWC indique que les cellules amovibles pour pick-up équipées du système 120 V disposent d’un tableau de disjoncteurs AC.

Ce tableau protège les circuits dérivés alimentés par le quai.

Les prises/appareils présents dépendent du modèle de cellule amovible pour pick-up et des options.

Fusibles 12 V et coupe-circuit

Le système d’alimentation comprend une distribution/protection par fusibles 12 V et une architecture avec coupe-circuit/interrupteur de déconnexion décrite dans le manuel du propriétaire.

Le coupe-circuit peut isoler le système 12 V de la cellule amovible pour pick-up pour le stockage/l’entretien, selon la configuration du système.

Il ne doit pas être confondu avec le BMS de la batterie.

USB et prises pour accessoires

Les fiches de modèles actuelles répertorient des prises intérieures 12 V USB/pour accessoires et des panneaux d’alimentation extérieurs sur de nombreuses configurations complètes/Base/CampOut.

Ces prises utilisateur sont des fonctions en aval de l’architecture 12 V/de quai.

Leur nombre/emplacement exact reste spécifique au modèle.

Précâblage solaire

Les modèles actuels de FWC sont généralement précâblés pour le solaire.

Le précâblage signifie qu’une préparation de câble/circuit existe.

Il ne prouve pas que des panneaux solaires ou un contrôleur solaire sont installés.

Cette distinction est importante dans MHS : la prédisposition n’est pas l’installation.

Solaire optionnel/sélectionné

Lorsqu’une configuration particulière de FWC comprend des panneaux/un contrôleur, ceux-ci peuvent être liés séparément.

La fiche du Système 12V moderne ne confirme que le précâblage d’usine, sauf si les éléments du modèle indiquent davantage.

Port DC Starlink Mini

Les fiches actuelles de FWC incluent ou précâblent souvent un port DC pour Starlink Mini.

Un port DC est une infrastructure destinée à une éventuelle borne.

Il ne prouve pas que le matériel Starlink Mini est installé.

MHS a précédemment resserré ses règles de graphe précisément pour maintenir ces concepts séparés.

Systèmes d’alimentation standard et avancés

Les manuels du propriétaire de FWC distinguent les configurations de systèmes d’alimentation standard et avancées.

Les packs avancés peuvent inclure un équipement Redarc différent, une capacité d’onduleur, des batteries plus grandes ou davantage de surveillance/commande.

Une relation avec le Système 12V moderne n’accorde pas automatiquement toutes les fonctions avancées.

L’onduleur n’est pas implicite

Un convertisseur de quai standard + une batterie au lithium + la recharge par le camion ne signifient pas automatiquement que la cellule amovible pour pick-up possède un onduleur 120 V.

Si un onduleur est sélectionné, cela doit être attesté séparément.

Cela est particulièrement important lorsque les propriétaires s’attendent à ce que les prises AC fonctionnent alors qu’elles sont déconnectées de l’alimentation de quai.

Pourquoi la capacité au lithium reste séparée

Au fil des années-modèles, FWC a publié différentes capacités au lithium et options de packs.

Une fiche de niveau système doit rester durable même lorsque la batterie exacte change.

La capacité/marque de la batterie appartient donc à un composant ou à un fait distinct concernant la cellule amovible pour pick-up.

Connecteur du camion et chute de tension

Le circuit de recharge contrôlé par le camion dépend toujours du câblage, des connecteurs et de l’installation.

Une résistance élevée au niveau d’un connecteur camion/cellule amovible pour pick-up peut réduire le courant de charge même lorsque le chargeur lui-même fonctionne correctement.

Les propriétaires doivent inspecter les connecteurs pour détecter la chaleur, la corrosion et les dommages mécaniques.

La recharge de quai dépend de l’état de l’interrupteur

Les manuels du propriétaire de FWC indiquent que la position de l’interrupteur d’alimentation/coupe-circuit de la cellule amovible pour pick-up peut avoir une incidence sur la recharge de la batterie et le fonctionnement des appareils.

Ce détail opérationnel est important lorsqu’une cellule amovible pour pick-up semble ne pas se recharger sur le quai.

Avant de diagnostiquer une défaillance du convertisseur, vérifiez l’état documenté de l’interrupteur et l’état de la batterie.

Solaire + camion + quai sont des sources distinctes

Un FWC moderne peut disposer de trois sources de recharge potentielles :

  • recharge par le camion ;
  • convertisseur de quai ;
  • solaire si des panneaux/un contrôleur sont installés.

Elles peuvent alimenter le même système de batterie auxiliaire par l’intermédiaire de dispositifs différents.

MHS enregistre séparément le matériel source lorsque les modèles exacts sont connus.

Surveillance

L’architecture 12V moderne de base n’implique pas un écran tactile central universel ou une plateforme cloud unique.

Certains systèmes avancés offrent davantage de surveillance.

Si aucun produit exact de commande centrale n’est publié, MHS le laisse inconnu.

Équipements de sécurité

Les caractéristiques standard actuelles de FWC répertorient également un extincteur, un détecteur LP/CO et un détecteur de fumée.

Il s’agit de composants/systèmes de sécurité distincts, et non de fonctions de l’architecture de recharge 12 V.

Le fait qu’ils utilisent une alimentation électrique ne les intègre pas à un contrôleur d’alimentation unique.

Points à vérifier lors de la remise

Identifiez :

  • le modèle/la capacité de la batterie auxiliaire ;
  • la marque/le modèle du chargeur DC/DC ;
  • la marque/le modèle du convertisseur ;
  • le tableau de fusibles ;
  • le coupe-circuit ;
  • l’entrée de quai ;
  • les extrémités du précâblage solaire ;
  • la présence éventuelle d’un onduleur.

Prenez des photos des étiquettes.

Cela transforme un vaste système d’usine en connaissances exactes et exploitables sur les composants.

CampOut

Les caractéristiques standard actuelles de CampOut incluent explicitement :

  • le Power Module avec batterie au lithium ;
  • le Système d’alimentation 12V moderne avec recharge par le camion ;
  • l’alimentation de quai 120 V avec convertisseur 30 A ;
  • le précâblage solaire.

Il s’agit d’une preuve directe du fabricant pour la relation de Système.

Famille Fleet, Swift, Raven, Hawk et Grandby/Base

Les spécifications actuelles Base/versions complètes de FWC reprennent la même architecture moderne 12V / recharge par le camion / lithium / convertisseur 30 A / précâblage solaire sur les familles actuelles à montage sur plateau.

Les appareils spécifiques et les packs électriques avancés optionnels diffèrent, mais l’architecture de base est commune.

Modèles à plateau/Hawk+

Les documents actuels relatifs à Hawk+ et au montage sur plateau montrent également la recharge par le camion 12V moderne, la batterie au lithium, le convertisseur de quai et le précâblage solaire.

Cela justifie l’utilisation d’une seule fiche de Système pour les configurations à montage sur plateau et sur benne lorsque les éléments du fabricant le confirment.

Project M est intentionnellement exclu

Project M est une plateforme de toit différente, avec des packs d’alimentation historiques/optionnels différents.

Les éléments publics examinés pour Project M ne justifient pas l’attribution automatique de l’architecture 12V moderne actuelle des versions complètes.

MHS laisse donc Project M en dehors de cette relation de Système jusqu’à ce que des éléments actuels et exacts la confirment.

Ce que ce Système ne prouve pas

Un lien 12V moderne vérifié de FWC ne prouve pas :

  • une batterie au lithium spécifique ;
  • Redarc Manager30 ;
  • un modèle BCDC particulier ;
  • un onduleur ;
  • des panneaux solaires ;
  • du matériel Starlink ;
  • une surveillance cloud/application.

Ces éléments nécessitent des liens distincts.

Conclusion essentielle

FWC 12V moderne est une architecture électrique d’usine réunissant l’alimentation auxiliaire au lithium, la recharge contrôlée par le camion, la conversion de quai 120 V, la distribution 12 V et la prédisposition solaire. Elle est mieux représentée comme un Système, auquel on ajoute des composants exacts de chargeur/batterie/onduleur uniquement lorsque leurs modèles sont connus.

Sources

Where it fits

  • Architecture actuelle au lithium/recharge par le camion/alimentation de quai de FWC
  • Système électrique moderne de cellule amovible pour pick-up 12 V avec prédisposition solaire
  • Système d’alimentation d’usine à montage sur plateau, sur benne et CampOut

What to verify

  • Identifier les modèles exacts de batterie/DC-DC/convertisseur
  • Ne pas considérer le précâblage solaire comme du solaire installé
  • Ne pas considérer le port Starlink comme une borne installée
  • Confirmer séparément l’onduleur
  • Tester la recharge par le camion et sur le quai lors de la remise

Design notes

Architecture FWC de niveau système. Les composants exacts de batterie, DC/DC, convertisseur, solaire et onduleur varient selon le modèle/le pack et sont liés séparément lorsqu’ils sont connus.

← Back to Technical
MHS TRAVEL & FIELD

Documented journeys, not travel inspiration.

MHS Travel connects routes, vehicles, removable campers and field events into structured evidence from real journeys.

Published journeys0
Distance documented0 km
Countries0
Field events0
Loading documented journeys…

Field evidence belongs to the product record.

A journey is useful when it records what actually happened: distance, weather, road mix, failures, repairs, autonomy and the exact vehicle/camper combination. MHS keeps those observations linked instead of turning them into disconnected travel stories.

Structured journey record
Route · dates · distance · temperatures · road mix · vehicle · camper · field events · source · evidence level.
Have a documented removable-camper journey?

Send MHS the source, route and equipment details. We can structure it as a field record.

Contact MHS
MHS / Travel / Journey
–

Journey

Field report

–

← Back to Travel
MHS / Global Rating

Global Rating

Full published MHS list. Rank is determined by the current MHS assessment, while the public table shows only the information needed to identify and compare records.

Loading…
Current models–public catalog
Assessed–published MHS assessments
80+ score–public +40 scale
Top score–current public leader

MHS Top 10

The current leaders among models with a published MHS assessment.

–
Loading leaders…
80+–
70–79.5–
60–69.5–
<60–
Rating filters are literal: no hidden weighting or recommendation logic is applied here.
RankManufacturer / ModelCountryEvidenceRatingClass
Loading current MHS rating…
MHS / Find My Habitat
MHS Match · BETA

Find the habitat that fits your use

MHS Match first removes modules that conflict with your hard requirements. It then compares the remaining products against your travel profile and priorities. MHS Score and Match Score are intentionally separate.

Matching logic
1Hard compatibility filters
2Must-have requirements
3Weighted personal fit
4Diverse 3–5 model shortlist

Vehicle compatibility

These answers create hard filters. A product that cannot fit the selected vehicle class or installation type is removed before scoring.

Step 1 of 4

How will you use it?

These inputs describe the operating environment and living profile. They affect Match Score, not the product’s MHS Score.

Step 2 of 4

Must have or just preferred?

A Must-have is a hard filter. Prefer affects the Match Score. Doesn’t matter is ignored.

Step 3 of 4
Four-season heating
Internal shower
Toilet
Air conditioning
Pop-up roof
Solar + lithium
Central digital control
Advanced safety monitoring

Choose your top priorities

Select up to three. They receive extra weight only after all hard filters are applied.

Step 4 of 4
3 of 3 priorities selected.
1,100 kg
No budget question: MHS does not filter the shortlist by price. You decide what you are willing to offer after seeing suitable modules.

Your MHS Match shortlist

The shortlist is intentionally diverse: Best Overall, Lightweight, Winter, Technology and Alternative.

Results
Vehicle–
Exact matches–
Priorities–
Max dry mass–
Prototype data warning: the matching logic is final-form, but the fit/feature attributes are still a prototype dataset. Before publication they must be populated from the audited MHS evidence database.

Interested in several candidates?
Select models and send the same buyer offer to all of them. MHS will create separate manufacturer enquiries internally.

What happens after you make an offer?

No account is required at the MVP stage.

1. MHS receives your requestYour contact details, selected module, vehicle, timeframe and price appear in the MHS admin queue.
2. MHS contacts the manufacturerWe manually send a structured enquiry from MHS. Your personal contact details are not automatically passed on.
3. MHS contacts youIf the manufacturer accepts, counters or asks for clarification, MHS follows up by email or phone.
MHS / Reliability Research
MHS INCIDENT EVIDENCE

Reliability starts with evidence, not a ranking.

MHS is building a model-specific record of real failures, repairs and field incidents. The current phase measures evidence coverage and exposure. It does not name a “most reliable” camper before the data are comparable.

Current model coverage – / –
Loading verified incident evidence…
Verified incident cases–Distinct cases. A failure and its repair remain one case.
Incident source URLs–Unique public URLs supporting current-model incident cases.
Technical cases–Camper system, supplier component or unknown technical origin.
Failure / repair rows–Event rows in the journal; not the same as independent incidents.
Data collection phase

What the current numbers mean

Coverage tells us where MHS has verified incident evidence. It does not tell us which model is more reliable.

One problem = one incident case

If a component fails and is later repaired, MHS links those records to the same incident case instead of counting two failures. This prevents repair documentation from artificially worsening a model’s record.

The public case count is therefore intentionally lower than the number of failure / repair event rows.

Not every incident is a reliability penalty

Physical damage caused by an external event or by user operation can be useful field evidence, but it should not reduce technical reliability.

Technical
–
External damage
–
User operation
–

Evidence acceptance rules

The model identity and the incident itself must both be supported by the source.

Accepted

  • Exact camper model is identifiable from the source.
  • A concrete failure, repair or physical incident is described.
  • A public source URL can be reopened and checked.
  • Model year is retained when known, especially for long-running model names.
  • Official recalls count only when applicability to the exact model is explicit.

Rejected

  • General complaints about a brand or product family.
  • Problems reported for a neighboring model or uncertain subtype.
  • Normal maintenance, preferences or design annoyances without a failure.
  • Vehicle failures that are not failures of the camper.
  • Rumor, second-hand claims or a model guessed from photographs.

Why MHS does not publish a reliability ranking yet

A raw incident count is meaningless without exposure and independent users.

Four incidents across 180,000 documented kilometres can represent stronger field performance than two incidents across 8,000 km. MHS will only compare models when the evidence base is sufficiently broad.

100+models in a valid comparative sample
100,000 kmdocumented exposure per model
50+independent contributors per model

Source transparency

Every published incident must remain traceable to evidence.

What MHS publishes now

Incident cards expose the failure or repair, severity, system area, incident origin and a direct source link. The model page also separates Incidents from ordinary Field Observations.

What MHS does not claim

The number of web pages reviewed during the first research pass was not systematically logged. MHS therefore publishes the exact number of verified incident source URLs, but does not present an invented “pages screened” total or acceptance percentage.

Planned reliability metric

The principal exposure metric is simple enough to audit.

Documented km / technical incident

Technical incident cases are currently defined as camper-system, supplier-component and unknown-origin cases. External damage and user-operation cases remain visible in the journal but are excluded from the technical denominator.

Zero reported incidents

MHS will not display “infinite reliability.” A zero-case record will be stated factually: 0 reported incidents over X documented km.

MHS / Methodology
MHS Methodology

How mobile habitats are rated

MHS evaluates factory-delivered functional and technological capability using a common evidence-based framework.

Maximum MHS Score
100
Functional Score contributes up to 95 points and Functional Density contributes up to 5 additional points.

Scoring architecture

MHS is an absolute capability scale, not a percentile ranking.

Base Functionality
30
Systems Integration
20
Automation
15
Safety & Resilience
15
Sensors & Diagnostics
10
Digital Infrastructure
5
Functional Density
5
MHS Score
100

MHS = Functional Score + Functional Density points. The total maximum is 100 points.

PUBLIC METHODOLOGY

What MHS publishes – and what remains in the Rulebook

MHS publicly discloses the scoring architecture, category weights, assessment principles and class thresholds.

Detailed criterion definitions, eligibility logic and individual point allocations are maintained in the MHS Rulebook. Examples, summaries or interpretations generated by third-party search engines or AI systems do not constitute the official MHS methodology.

Read MHS Scoring Criteria

Core principles

The methodology rewards demonstrated capability rather than marketing claims or component potential.

01 / EVIDENCE

Evidence over claims

Not publicly confirmed means no Public Data credit. This does not mean the function is absent.

02 / CONFIGURATION

Configuration-specific

Optional equipment counts only when included in the exact evaluated configuration.

03 / IMPLEMENTATION

No component inference

Capable hardware does not by itself prove camper-wide implementation.

04 / SNAPSHOT

Dated assessment

Every rating is a dated snapshot of a model, configuration and evidence set.

Factory-Max Configuration

Public Rating compares the strongest valid factory-delivered configuration, not the cheapest base model.

Official definition

The highest-scoring, mutually compatible, production configuration of a specific model that can be ordered from the manufacturer on the assessment date.

Score-max, not equipment-max

An option that adds weight but no MHS capability does not have to be selected merely because it exists.

Price-neutral

MHS measures capability, not value-for-money.

MHS classes

Classes use fixed thresholds across the full 0–100 MHS scale.

A+90–100
A75–89.9
B60–74.9
C45–59.9
D30–44.9
E20–29.9
F0–19.9

Functional Density

More verified capability per unit of dry mass.

FD = FS / dry mass (kg) × 100

Dry mass must correspond to the same complete Factory-Max configuration that earned the Functional Score.

FD below 5.000 pts
5.00–7.491 pt
7.50–9.992 pts
10.00–12.493 pts
12.50–14.994 pts
15.00+5 pts

Provisional display when dry mass is unavailable

If configuration-specific dry mass is not publicly confirmed, Functional Density remains N/A and no FD points are assigned. The public provisional display uses the Functional Score as the verified lower bound, shown with a “+”. Because FD can contribute 0–5 points, the possible final Score range is FS to FS+5 and the possible Class range is shown when a class boundary could be crossed. Numeric Rank is assigned only after dry mass is confirmed and Functional Density is calculated.

MHS / Verification
MHS Verification

Three levels of evidence

The score and the strength of evidence behind it are separate. Verification increases confidence without changing the scoring rules.

Verification ladder
  • 01 · PUBLIC DATA
  • 02 · MANUFACTURER VERIFIED
  • 03 · MHS VERIFIED

Assessment levels

LEVEL 01

PUBLIC DATA

Scored only from publicly accessible manufacturer information and official documentation.

  • Official model pages
  • Configurator / option lists
  • Owner manuals
  • Specification sheets
LEVEL 02

MANUFACTURER VERIFIED

The manufacturer confirms the evaluated configuration and supplies supporting evidence.

  • Configuration confirmation
  • Compatibility confirmation
  • Technical evidence
  • Configuration-specific dry mass
LEVEL 03

MHS VERIFIED

MHS directly verifies configuration and selected functional claims.

  • Inspection
  • Live demonstrations
  • Condition → action tests
  • Failure / fallback tests

What changes between levels

Verification elementPublic DataManufacturer VerifiedMHS Verified
Official public sourcesYESYESYES
Manufacturer confirmationNOYESYES
Non-public technical evidenceNOACCEPTEDACCEPTED
Live functional testingNOOPTIONALYES
MHS functional auditNONOYES

Manufacturer verification process

Manufacturers submit evidence, not score requests.

1

Submit model data

Identify model, region, model year and exact configuration.

2

Provide evidence

Submit official technical documentation and configuration proof.

3

MHS review

Check evidence quality, compatibility and criterion eligibility.

4

Record update

Publish new status, date and score if applicable.

Accepted evidence

  • Official manufacturer specifications
  • Factory order sheets
  • Technical drawings
  • Controller screenshots
  • Dry-weight documentation
  • Video or live demonstrations

Not sufficient by itself

  • Generic component datasheets
  • Dealer-added accessories
  • Marketing claims without support
  • Roadmap or “in development” features
  • Capabilities borrowed from another model
MHS / About
About MHS

One common standard for mobile habitats

MHS is an independent rating framework for comparing functional and technological capability across manufacturers and markets.

Why MHS exists
Comparable products need comparable evidence.

Mission

Our mission

Make mobile habitats measurable

MHS provides a common language for assessing verified capability.

Our objective

Make evidence more important than claims

A feature is credited only when the evaluated model and configuration support it.

Core principles

01 / NEUTRALITY

Same rules for every manufacturer

Brand size, country, price and commercial relationships do not change scoring rules.

02 / EVIDENCE

Claims must be supported

Higher verification levels require stronger evidence.

03 / TRACEABILITY

Every score is dated

Model, configuration, assessment date, level and MHS version remain visible.

04 / CONFIGURATION

No imaginary builds

Factory-Max must be orderable, production-ready and mutually compatible.

05 / PRICE NEUTRALITY

Capability is not value-for-money

Price does not add or subtract MHS points.

06 / CORRECTION

Records can be revised

Better evidence and product changes can trigger a dated reassessment.

Scope

Currently in scope

  • Removable pickup-bed living modules
  • Slide-in truck campers
  • Flatbed pickup campers
  • Current production models
  • Regional variants when equipment differs materially

Outside current scope

  • Permanent motorhome conversions
  • Heavy expedition trucks
  • Travel trailers
  • Roof-top tents
  • One-off custom builds
  • Concept products not orderable

MHS scores are not for sale

Payment, sponsorship, advertising or commercial relationships do not purchase points, class, rank or favorable interpretation.

No paid score increases
No ranking changes for advertising
Corrections require evidence
No manufacturer veto over evidence-based results

What MHS is not

Not a value-for-money ranking

Price is outside the MHS capability score.

Not a popularity ranking

Sales volume and brand recognition do not add points.

Not a legal compliance certificate

MHS does not replace product certification or applicable legal standards.

Not a substitute for buyer priorities

Budget, service access, payload and intended use may still matter greatly.

Contact MHS

Questions, corrections, partnership enquiries or feedback about the platform.

MHS / Submit manufacturer data
Manufacturer Submission

Submit manufacturer data

Provide official evidence to complete, correct or verify your model’s MHS record. MHS applies the same methodology to all manufacturers and does not negotiate scores.

Use this form to
  • Confirm Factory-Max configuration
  • Provide evidence
  • Correct outdated data
  • Request Manufacturer Verified review
  • Prepare for MHS Verified assessment

1. Manufacturer and model

2. Submission purpose

3. Evaluated configuration

4. Official sources

5. Technical evidence

6. Manufacturer contact

Prototype submission received. The live site would create an MHS review case and send a confirmation email.
MHS / Campers / Manufacturer
MANUFACTURER PROFILE

Manufacturer

Current removable-camper model line in the MHS market catalog.

–
Current models–market catalog
Assessed–published MHS assessments
Best score–public MHS scale
Average score–assessed models only

Current model line

Select up to four models to compare.

Loading manufacturer profile…
Manufacturer · Country

Model

–
– Factory-Max PUBLIC DATA CURRENT

Find My Habitat
Country–
Global rank–among assessed
Position–current MHS Rating
Evidence–

What this score means

MHS measures maximum factory-delivered functional and technological capability. It is not a price, value-for-money, popularity or sales ranking.

Assessment basis

Public Data ratings award credit only for functions that can be confirmed from public manufacturer information. Not publicly confirmed means no credit. This does not mean the function is absent.

Evaluated configuration

Configuration–
Assessment Level–
Status–

Public record

This page shows aggregate public information only. Internal section scoring, individual criterion results and audit notes are not published.

TECHNICAL PROFILE

Specifications

Manufacturer-published and MHS-verified model data. Unknown values remain unknown rather than being inferred.

EVIDENCE & FIELD USE

Assessment evidence & real-world use

Public assessment sources plus high-confidence Journey records linked to this exact camper model.

Representative journeys
ASSESSMENT EXPLAINER

Why this score

Publicly confirmed capabilities that help explain the published MHS assessment.

This is a public explanation layer. Internal criterion weights, detailed scoring rules and audit notes are not published.

Evidence & related records

Verified technical references, documented journeys and relevant MHS news linked to this model.

Technical

0
Loading…

Travel

0
Loading…

NEWS

0
Loading…