MHSMOBILE HABITAT STANDARD
CAMPERSTECHNICALTRAVELNEWS
MHS · REMOVABLE MOBILE HABITATS

The global knowledge portal for removable mobile habitats.

Compare campers, understand their systems, solve technical questions, discover real journeys and follow the industry in one independent platform.

100-point ratingEvidence-based recordsTechnical knowledgeTravel & field reportsVerified incident evidence

Top rated modules

The twenty highest ranked assessed configurations currently published by MHS.

RankManufacturer / ModelCountryEvidenceRatingClass
Loading current MHS rating…

MHS classes

The full MHS scale runs from 0 to 100 points.

How MHS works
A+90–100
A75–89.9
B60–74.9
C45–59.9
D30–44.9
E20–29.9
F0–19.9

MHS NEWS

Independent coverage of products, manufacturers, technology, market developments, events and regulation.

All news

Loading MHS News…

MHS CAMPER DATABASE

Explore removable campers.

Browse the MHS market catalog, filter by vehicle fitment and technical specifications, compare assessed products and open a structured profile for every published model.

–Catalog records
–Assessed
–Manufacturers
–Countries
⌕
Loading database…Structured MHS market records
Open ranking →
Loading MHS Camper Database…
MHS TECHNICAL KNOWLEDGE

The engineering encyclopedia behind mobile habitats.

Understand the components inside a camper, how complete systems are built and how the engineering works in practice. MHS Technical connects equipment, system architecture, guides and confirmed camper installations.

Explore by system

Start with the subsystem you are trying to understand. Each system connects architecture, components, guides and camper installations.

Loading knowledge records…

Technical records

Foundation records for the MHS Technical Knowledge Base.

One engineering layer across MHS

A camper profile tells you what product exists. Technical explains what is inside it, how the system works and which exact components are confirmed in real camper records.

COMPONENTA specific piece of equipment and its verified manufacturer data.
SYSTEMThe architecture that connects multiple components into one working subsystem.
GUIDEA practical explanation of an engineering question or design decision.
CAMPER LINKConfirmed installations connect technical records back to real products.
MHS TECHNICAL / SYSTEM 01

Power & Electrical

The electrical system is the energy backbone of a mobile habitat. This page shows the architecture from charging sources to storage, distribution, conversion, protection and monitoring, then links each layer to the MHS component and guide records that explain it.

System architecture

This is a conceptual architecture, not an installation wiring diagram. Exact cable sizes, protection devices, charging limits and grounding depend on the selected equipment and vehicle.

Vehicle alternator
→
DC/DC charger
→
House battery
Solar array
→
MPPT controller
→
House battery
Shore power
→
Inverter / charger
↔
House battery
House battery
→
DC distribution + protection
→
12 V loads
House battery
→
Inverter
→
AC loads
Monitoring sits across the architecture rather than in the power path: shunts, chargers, inverter/chargers and gateways report energy flow and device state without replacing hardwired protection.

What the system has to do

  • Accept energy from the vehicle, solar and shore-power sources that are actually installed.
  • Store energy in the house battery within the battery and BMS operating limits.
  • Distribute DC power with branch protection and service isolation.
  • Convert DC to AC when an inverter is part of the camper architecture.
  • Expose enough monitoring to understand battery state and charging behaviour.

MHS records in this system

← Back to Technical
MHS / Technical

Victron SmartShunt:还剩多少电池电量

测量充电和放电电流,以估算剩余电量。它不会为电池充电,也不能替代电池保护装置。

Overview

为什么要跟踪流入和流出的电量?

MHS 说明。停车数小时后,您可能想知道的不只是电池电压:还剩多少电量?SmartShunt 通过测量电池电流并随时间进行跟踪来提供帮助。

可以把它理解为记录流入和流出电量的账户。它跟踪进入电池的电量以及设备使用的电量。根据这些测量值及其设置,它会计算剩余电量百分比。这是一个有用的估算值,而不是直接查看每个电池单元内部状态。

来源:1

500 A 和 50 mV 是什么意思?

MHS 说明。本文介绍标准 SmartShunt 500 A / 50 mV 及其 IP21 外壳。分流器是被监测电流通过的测量元件。500 A 表示其额定电流;50 mV 是相应的测量电压降。

这两个数值都不是电池容量。设备不会存储 500 Ah,也不会以 500 A 为电流给电池充电。其额定值不能直接与电池上印刷的“200 Ah”进行比较:这些数字表示不同的量。

来源:2

一个简单的安时示例

假设设备持续消耗 10 A,持续三小时,且没有其他电源。电池因此减少 30 Ah:即 10 乘以 3。对于假定为 200 Ah 的容量,这相当于其标称电量的 15%。

这只是一个算术示例。它未考虑电池特性、温度、变化中的负载以及允许的放电深度。其目的是说明某一时刻的电流与一段时间内使用的电量之间的区别。在实际系统中,SmartShunt 会使用测量值和配置的电池参数。

为什么充电器工作时它仍可能显示放电?

MHS 说明。SmartShunt 报告的是电池的净电流。如果进入共用电路的电流小于电器使用的电流,电池就会提供差额。充电器处于工作状态本身并不能证明存储的电量正在增加。

因此,充电器读数和电池监测器读数可能不同,这不一定表示存在故障:前者显示该设备的输出,后者显示计入负载后的结果。在期待每个屏幕显示相同数值之前,应先确定您比较的是哪些量。

来源:1

错误百分比的来源

计算结果取决于设置,也取决于是否测量了所有相关电流。连接在测量元件周围的设备不会被纳入该账户。容量设置错误也会改变结果。

因此,在增加设备后检查系统很有用,而不应只在最初安装时检查。新的逆变器、充电器或其他负载需要被正确测量。这要求根据手册检查电路;本文不建议在没有准备和安全隔离的情况下移动电源线。

来源:3

用通俗语言解释同步

监测器需要一个可信的参考点:完全充电的电池。它根据配置的条件识别该状态,并将其与 100% 读数关联起来。更新该参考点称为同步。

如果识别条件不正确,计算结果可能会逐渐偏离实际情况。手动设置“100%”不会为电池充电,也不会修复电池状态。不要仅仅为了从屏幕上移除一个不受欢迎的数字而使用该命令。首先确认电池已完全充电,并检查设置。

来源:4 · 3

为什么“剩余五小时”不是时间表

剩余时间估算取决于负载和所选的放电阈值。打开高功率电器,估算时间会减少;将其关闭,估算时间会增加。这不一定表示错误——预测所依据的假设已经发生变化。

规划过夜停留时,应考虑哪些设备会持续运行,哪些设备只会短暂运行,以及您希望保留多少储备电量。看起来很精确的显示不能替代这种判断。当负载大幅波动时,制造商本身也建议将时间估算视为参考。

来源:1

查看读数和使用额外输入

MHS 说明。VictronConnect 提供本地查看功能,而 VE.Direct 可将监测器连接到兼容的 GX 设备。金属舱室内的无线电接收可能较差,因此应在实际安装位置检查访问情况,而不只是放在工作台上检查。

辅助输入执行一个选定任务:第二电池电压、串联电池组的中点,或使用独立传感器测量温度。选择启动电池电压并不意味着监测器也会以与主电池相同的方式计算该电池的剩余容量。

来源:2 · 4

安装或更换电池后要检查什么

MHS 说明。将配置的容量和其他参数与已安装的电池进行核对。更换电池是复查设置的理由,即使新电池看起来相似。确认实际的电池消耗显示为放电,进入电池的电流显示为充电。

如果百分比长时间保持不变,或明显与系统行为相矛盾,应先进行调查。任意降低配置容量以获得“更谨慎的百分比”会改变读数的含义。期望的储备电量与电池自身特性是不同的事情。

来源:4 · 3

监测不能替代保护

SmartShunt 不是 BMS,也不能替代保险丝。显示的警告不应自动解释为已对不安全负载进行物理断开。那需要单独且经过适当设计的保护装置。

标准 IP21 外壳也不得与单独的 IP65 版本混淆。本文不承诺其适用于暴露在潮湿环境中的位置。请检查安装所需的准确部件、外壳防护、允许电流和连接要求。

来源:2 · 1

关键结论

当 SmartShunt 正确记录电池流入和流出的电流时,它很有用。其百分比有助于规划,但不能替代正确的设置、状态良好的电池或保护装置。

Where it fits

  • 房车电池的荷电状态和电流监测
  • 通过 VE.Direct 进行 Victron GX 和 VRM 监测
  • 通过辅助输入监测第二电池电压或使用可选温度传感器

What to verify

  • 将所有被测电池分支回路的回流通过正确的分流器连接端
  • 配置可用电池容量和特定化学体系的充电检测
  • 遵守 IP21 外壳额定值;它不是 IP65 版本
  • 不要仅凭 SmartShunt 宣称具有 BMS 断开功能或电芯级保护

Design notes

Kingstar 设备部件号需要确认。最大电池容量设置也仍在审查中,因为之前检索到的资料包包含不同版本的手册。

← Back to Technical
MHS TRAVEL & FIELD

Documented journeys, not travel inspiration.

MHS Travel connects routes, vehicles, removable campers and field events into structured evidence from real journeys.

Published journeys0
Distance documented0 km
Countries0
Field events0
Loading documented journeys…

Field evidence belongs to the product record.

A journey is useful when it records what actually happened: distance, weather, road mix, failures, repairs, autonomy and the exact vehicle/camper combination. MHS keeps those observations linked instead of turning them into disconnected travel stories.

Structured journey record
Route · dates · distance · temperatures · road mix · vehicle · camper · field events · source · evidence level.
Have a documented removable-camper journey?

Send MHS the source, route and equipment details. We can structure it as a field record.

Contact MHS
MHS / Travel / Journey
–

Journey

Field report

–

← Back to Travel
MHS / Global Rating

Global Rating

Full published MHS list. Rank is determined by the current MHS assessment, while the public table shows only the information needed to identify and compare records.

Loading…
Current models–public catalog
Assessed–published MHS assessments
80+ score–public +40 scale
Top score–current public leader

MHS Top 10

The current leaders among models with a published MHS assessment.

–
Loading leaders…
80+–
70–79.5–
60–69.5–
<60–
Rating filters are literal: no hidden weighting or recommendation logic is applied here.
RankManufacturer / ModelCountryEvidenceRatingClass
Loading current MHS rating…
MHS / Find My Habitat
MHS Match · BETA

Find the habitat that fits your use

MHS Match first removes modules that conflict with your hard requirements. It then compares the remaining products against your travel profile and priorities. MHS Score and Match Score are intentionally separate.

Matching logic
1Hard compatibility filters
2Must-have requirements
3Weighted personal fit
4Diverse 3–5 model shortlist

Vehicle compatibility

These answers create hard filters. A product that cannot fit the selected vehicle class or installation type is removed before scoring.

Step 1 of 4

How will you use it?

These inputs describe the operating environment and living profile. They affect Match Score, not the product’s MHS Score.

Step 2 of 4

Must have or just preferred?

A Must-have is a hard filter. Prefer affects the Match Score. Doesn’t matter is ignored.

Step 3 of 4
Four-season heating
Internal shower
Toilet
Air conditioning
Pop-up roof
Solar + lithium
Central digital control
Advanced safety monitoring

Choose your top priorities

Select up to three. They receive extra weight only after all hard filters are applied.

Step 4 of 4
3 of 3 priorities selected.
1,100 kg
No budget question: MHS does not filter the shortlist by price. You decide what you are willing to offer after seeing suitable modules.

Your MHS Match shortlist

The shortlist is intentionally diverse: Best Overall, Lightweight, Winter, Technology and Alternative.

Results
Vehicle–
Exact matches–
Priorities–
Max dry mass–
Prototype data warning: the matching logic is final-form, but the fit/feature attributes are still a prototype dataset. Before publication they must be populated from the audited MHS evidence database.

Interested in several candidates?
Select models and send the same buyer offer to all of them. MHS will create separate manufacturer enquiries internally.

What happens after you make an offer?

No account is required at the MVP stage.

1. MHS receives your requestYour contact details, selected module, vehicle, timeframe and price appear in the MHS admin queue.
2. MHS contacts the manufacturerWe manually send a structured enquiry from MHS. Your personal contact details are not automatically passed on.
3. MHS contacts youIf the manufacturer accepts, counters or asks for clarification, MHS follows up by email or phone.
MHS / Reliability Research
MHS INCIDENT EVIDENCE

Reliability starts with evidence, not a ranking.

MHS is building a model-specific record of real failures, repairs and field incidents. The current phase measures evidence coverage and exposure. It does not name a “most reliable” camper before the data are comparable.

Current model coverage – / –
Loading verified incident evidence…
Verified incident cases–Distinct cases. A failure and its repair remain one case.
Incident source URLs–Unique public URLs supporting current-model incident cases.
Technical cases–Camper system, supplier component or unknown technical origin.
Failure / repair rows–Event rows in the journal; not the same as independent incidents.
Data collection phase

What the current numbers mean

Coverage tells us where MHS has verified incident evidence. It does not tell us which model is more reliable.

One problem = one incident case

If a component fails and is later repaired, MHS links those records to the same incident case instead of counting two failures. This prevents repair documentation from artificially worsening a model’s record.

The public case count is therefore intentionally lower than the number of failure / repair event rows.

Not every incident is a reliability penalty

Physical damage caused by an external event or by user operation can be useful field evidence, but it should not reduce technical reliability.

Technical
–
External damage
–
User operation
–

Evidence acceptance rules

The model identity and the incident itself must both be supported by the source.

Accepted

  • Exact camper model is identifiable from the source.
  • A concrete failure, repair or physical incident is described.
  • A public source URL can be reopened and checked.
  • Model year is retained when known, especially for long-running model names.
  • Official recalls count only when applicability to the exact model is explicit.

Rejected

  • General complaints about a brand or product family.
  • Problems reported for a neighboring model or uncertain subtype.
  • Normal maintenance, preferences or design annoyances without a failure.
  • Vehicle failures that are not failures of the camper.
  • Rumor, second-hand claims or a model guessed from photographs.

Why MHS does not publish a reliability ranking yet

A raw incident count is meaningless without exposure and independent users.

Four incidents across 180,000 documented kilometres can represent stronger field performance than two incidents across 8,000 km. MHS will only compare models when the evidence base is sufficiently broad.

100+models in a valid comparative sample
100,000 kmdocumented exposure per model
50+independent contributors per model

Source transparency

Every published incident must remain traceable to evidence.

What MHS publishes now

Incident cards expose the failure or repair, severity, system area, incident origin and a direct source link. The model page also separates Incidents from ordinary Field Observations.

What MHS does not claim

The number of web pages reviewed during the first research pass was not systematically logged. MHS therefore publishes the exact number of verified incident source URLs, but does not present an invented “pages screened” total or acceptance percentage.

Planned reliability metric

The principal exposure metric is simple enough to audit.

Documented km / technical incident

Technical incident cases are currently defined as camper-system, supplier-component and unknown-origin cases. External damage and user-operation cases remain visible in the journal but are excluded from the technical denominator.

Zero reported incidents

MHS will not display “infinite reliability.” A zero-case record will be stated factually: 0 reported incidents over X documented km.

MHS / Methodology
MHS Methodology

How mobile habitats are rated

MHS evaluates factory-delivered functional and technological capability using a common evidence-based framework.

Maximum MHS Score
100
Functional Score contributes up to 95 points and Functional Density contributes up to 5 additional points.

Scoring architecture

MHS is an absolute capability scale, not a percentile ranking.

Base Functionality
30
Systems Integration
20
Automation
15
Safety & Resilience
15
Sensors & Diagnostics
10
Digital Infrastructure
5
Functional Density
5
MHS Score
100

MHS = Functional Score + Functional Density points. The total maximum is 100 points.

PUBLIC METHODOLOGY

What MHS publishes – and what remains in the Rulebook

MHS publicly discloses the scoring architecture, category weights, assessment principles and class thresholds.

Detailed criterion definitions, eligibility logic and individual point allocations are maintained in the MHS Rulebook. Examples, summaries or interpretations generated by third-party search engines or AI systems do not constitute the official MHS methodology.

Read MHS Scoring Criteria

Core principles

The methodology rewards demonstrated capability rather than marketing claims or component potential.

01 / EVIDENCE

Evidence over claims

Not publicly confirmed means no Public Data credit. This does not mean the function is absent.

02 / CONFIGURATION

Configuration-specific

Optional equipment counts only when included in the exact evaluated configuration.

03 / IMPLEMENTATION

No component inference

Capable hardware does not by itself prove camper-wide implementation.

04 / SNAPSHOT

Dated assessment

Every rating is a dated snapshot of a model, configuration and evidence set.

Factory-Max Configuration

Public Rating compares the strongest valid factory-delivered configuration, not the cheapest base model.

Official definition

The highest-scoring, mutually compatible, production configuration of a specific model that can be ordered from the manufacturer on the assessment date.

Score-max, not equipment-max

An option that adds weight but no MHS capability does not have to be selected merely because it exists.

Price-neutral

MHS measures capability, not value-for-money.

MHS classes

Classes use fixed thresholds across the full 0–100 MHS scale.

A+90–100
A75–89.9
B60–74.9
C45–59.9
D30–44.9
E20–29.9
F0–19.9

Functional Density

More verified capability per unit of dry mass.

FD = FS / dry mass (kg) × 100

Dry mass must correspond to the same complete Factory-Max configuration that earned the Functional Score.

FD below 5.000 pts
5.00–7.491 pt
7.50–9.992 pts
10.00–12.493 pts
12.50–14.994 pts
15.00+5 pts

Provisional display when dry mass is unavailable

If configuration-specific dry mass is not publicly confirmed, Functional Density remains N/A and no FD points are assigned. The public provisional display uses the Functional Score as the verified lower bound, shown with a “+”. Because FD can contribute 0–5 points, the possible final Score range is FS to FS+5 and the possible Class range is shown when a class boundary could be crossed. Numeric Rank is assigned only after dry mass is confirmed and Functional Density is calculated.

MHS / Verification
MHS Verification

Three levels of evidence

The score and the strength of evidence behind it are separate. Verification increases confidence without changing the scoring rules.

Verification ladder
  • 01 · PUBLIC DATA
  • 02 · MANUFACTURER VERIFIED
  • 03 · MHS VERIFIED

Assessment levels

LEVEL 01

PUBLIC DATA

Scored only from publicly accessible manufacturer information and official documentation.

  • Official model pages
  • Configurator / option lists
  • Owner manuals
  • Specification sheets
LEVEL 02

MANUFACTURER VERIFIED

The manufacturer confirms the evaluated configuration and supplies supporting evidence.

  • Configuration confirmation
  • Compatibility confirmation
  • Technical evidence
  • Configuration-specific dry mass
LEVEL 03

MHS VERIFIED

MHS directly verifies configuration and selected functional claims.

  • Inspection
  • Live demonstrations
  • Condition → action tests
  • Failure / fallback tests

What changes between levels

Verification elementPublic DataManufacturer VerifiedMHS Verified
Official public sourcesYESYESYES
Manufacturer confirmationNOYESYES
Non-public technical evidenceNOACCEPTEDACCEPTED
Live functional testingNOOPTIONALYES
MHS functional auditNONOYES

Manufacturer verification process

Manufacturers submit evidence, not score requests.

1

Submit model data

Identify model, region, model year and exact configuration.

2

Provide evidence

Submit official technical documentation and configuration proof.

3

MHS review

Check evidence quality, compatibility and criterion eligibility.

4

Record update

Publish new status, date and score if applicable.

Accepted evidence

  • Official manufacturer specifications
  • Factory order sheets
  • Technical drawings
  • Controller screenshots
  • Dry-weight documentation
  • Video or live demonstrations

Not sufficient by itself

  • Generic component datasheets
  • Dealer-added accessories
  • Marketing claims without support
  • Roadmap or “in development” features
  • Capabilities borrowed from another model
MHS / About
About MHS

One common standard for mobile habitats

MHS is an independent rating framework for comparing functional and technological capability across manufacturers and markets.

Why MHS exists
Comparable products need comparable evidence.

Mission

Our mission

Make mobile habitats measurable

MHS provides a common language for assessing verified capability.

Our objective

Make evidence more important than claims

A feature is credited only when the evaluated model and configuration support it.

Core principles

01 / NEUTRALITY

Same rules for every manufacturer

Brand size, country, price and commercial relationships do not change scoring rules.

02 / EVIDENCE

Claims must be supported

Higher verification levels require stronger evidence.

03 / TRACEABILITY

Every score is dated

Model, configuration, assessment date, level and MHS version remain visible.

04 / CONFIGURATION

No imaginary builds

Factory-Max must be orderable, production-ready and mutually compatible.

05 / PRICE NEUTRALITY

Capability is not value-for-money

Price does not add or subtract MHS points.

06 / CORRECTION

Records can be revised

Better evidence and product changes can trigger a dated reassessment.

Scope

Currently in scope

  • Removable pickup-bed living modules
  • Slide-in truck campers
  • Flatbed pickup campers
  • Current production models
  • Regional variants when equipment differs materially

Outside current scope

  • Permanent motorhome conversions
  • Heavy expedition trucks
  • Travel trailers
  • Roof-top tents
  • One-off custom builds
  • Concept products not orderable

MHS scores are not for sale

Payment, sponsorship, advertising or commercial relationships do not purchase points, class, rank or favorable interpretation.

No paid score increases
No ranking changes for advertising
Corrections require evidence
No manufacturer veto over evidence-based results

What MHS is not

Not a value-for-money ranking

Price is outside the MHS capability score.

Not a popularity ranking

Sales volume and brand recognition do not add points.

Not a legal compliance certificate

MHS does not replace product certification or applicable legal standards.

Not a substitute for buyer priorities

Budget, service access, payload and intended use may still matter greatly.

Contact MHS

Questions, corrections, partnership enquiries or feedback about the platform.

MHS / Submit manufacturer data
Manufacturer Submission

Submit manufacturer data

Provide official evidence to complete, correct or verify your model’s MHS record. MHS applies the same methodology to all manufacturers and does not negotiate scores.

Use this form to
  • Confirm Factory-Max configuration
  • Provide evidence
  • Correct outdated data
  • Request Manufacturer Verified review
  • Prepare for MHS Verified assessment

1. Manufacturer and model

2. Submission purpose

3. Evaluated configuration

4. Official sources

5. Technical evidence

6. Manufacturer contact

Prototype submission received. The live site would create an MHS review case and send a confirmation email.
MHS / Campers / Manufacturer
MANUFACTURER PROFILE

Manufacturer

Current removable-camper model line in the MHS market catalog.

–
Current models–market catalog
Assessed–published MHS assessments
Best score–public MHS scale
Average score–assessed models only

Current model line

Select up to four models to compare.

Loading manufacturer profile…
Manufacturer · Country

Model

–
– Factory-Max PUBLIC DATA CURRENT

Find My Habitat
Country–
Global rank–among assessed
Position–current MHS Rating
Evidence–

What this score means

MHS measures maximum factory-delivered functional and technological capability. It is not a price, value-for-money, popularity or sales ranking.

Assessment basis

Public Data ratings award credit only for functions that can be confirmed from public manufacturer information. Not publicly confirmed means no credit. This does not mean the function is absent.

Evaluated configuration

Configuration–
Assessment Level–
Status–

Public record

This page shows aggregate public information only. Internal section scoring, individual criterion results and audit notes are not published.

TECHNICAL PROFILE

Specifications

Manufacturer-published and MHS-verified model data. Unknown values remain unknown rather than being inferred.

EVIDENCE & FIELD USE

Assessment evidence & real-world use

Public assessment sources plus high-confidence Journey records linked to this exact camper model.

Representative journeys
ASSESSMENT EXPLAINER

Why this score

Publicly confirmed capabilities that help explain the published MHS assessment.

This is a public explanation layer. Internal criterion weights, detailed scoring rules and audit notes are not published.

Evidence & related records

Verified technical references, documented journeys and relevant MHS news linked to this model.

Technical

0
Loading…

Travel

0
Loading…

NEWS

0
Loading…